Re: NWP REPAIR PHOTOS FROM NCRA
Author: ssrrmw
Date: 01-19-2007 - 12:55

Take a close look at the shadows. The embankment is being filled in and compacted without removing the rail (wierd), but enough room is left to insert ties under the rail. Ballast comes later.



Subject Written By Date/Time (PST)
  NWP REPAIR PHOTOS FROM NCRA Mike Pechner 01-19-2007 - 10:32
  Re: NWP REPAIR PHOTOS FROM NCRA Brian 01-19-2007 - 11:28
  Re: NWP REPAIR PHOTOS FROM NCRA DonB 01-19-2007 - 12:28
  Re: NWP REPAIR PHOTOS FROM NCRA ssrrmw 01-19-2007 - 12:55
  Re: NWP REPAIR PHOTOS FROM NCRA CPRR 01-19-2007 - 14:27
  Re: NWP REPAIR PHOTOS FROM NCRA abm 01-19-2007 - 23:19


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
  *******   **     **  **     **  ********   ********  
 **     **   **   **   **     **  **     **  **     ** 
 **           ** **    **     **  **     **  **     ** 
 ********      ***     **     **  ********   ********  
 **     **    ** **    **     **  **         **     ** 
 **     **   **   **   **     **  **         **     ** 
  *******   **     **   *******   **         ********  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com