Re: NWP REPAIR PHOTOS FROM NCRA
Author: abm
Date: 01-19-2007 - 23:19

Thanks for the update, Mike.
In the photo of the crews renewing the railroad embankment with dirt, that's pretty standard. These aren't "emergency" repairs where you dump 5000 tons of riprap, slap the tracks on it and hope it holds.
No need to lay rock that far below the roadbed, and good, compacted dirt will form a barrier against water flow, directing the water to the proper culverts/underpasses. See the guys with the "sheepsfoots" tamping the dirt?
I'd bet they'll let it sit thru a few rains too before they put rock on it, or at least until the tracks get repaired, ballasted and tamped.



Subject Written By Date/Time (PST)
  NWP REPAIR PHOTOS FROM NCRA Mike Pechner 01-19-2007 - 10:32
  Re: NWP REPAIR PHOTOS FROM NCRA Brian 01-19-2007 - 11:28
  Re: NWP REPAIR PHOTOS FROM NCRA DonB 01-19-2007 - 12:28
  Re: NWP REPAIR PHOTOS FROM NCRA ssrrmw 01-19-2007 - 12:55
  Re: NWP REPAIR PHOTOS FROM NCRA CPRR 01-19-2007 - 14:27
  Re: NWP REPAIR PHOTOS FROM NCRA abm 01-19-2007 - 23:19


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **      **  **     **   *******         ** 
 **     **  **  **  **  **     **  **     **        ** 
 **     **  **  **  **  **     **         **        ** 
 **     **  **  **  **  **     **   *******         ** 
  **   **   **  **  **   **   **          **  **    ** 
   ** **    **  **  **    ** **    **     **  **    ** 
    ***      ***  ***      ***      *******    ******  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com