Berg Wrote:
-------------------------------------------------------
> I thought the track's owner (MTDB) had embargoed
> the line with a construction exemption for
> you-know-who.
I don't. Who?
> So maybe, but not sure. Baja California RR has
> replaced those PIR guys and may be or have already
> fixed the line from Tecate to the border and Campo
> Museum??
Following the minutes of the MTDB, it looks like the Mexicans are putting a lot of money on the Mexican part of the line. It was Carrizo Gorge Railway who embargoed the freight. Then San Diego Imperial Railroad was removed to the contract and given to the PIR. Baja Railway has to pay both PIR and the MTDB as far as I know PIR payed Holland to run a geometry truck on the line, a friend works there and according to him they ran equipment on the line last year but they were never paid, so they didn't finish the inspection.
> Need more info.
I also need more information about this:
[
www.youtube.com]