Re: NWP -- Island Mtn. tunnel signal system
Author: ron
Date: 03-19-2017 - 08:20
Negin Wrote:
-------------------------------------------------------
> In case there was a fire in the tunnel.
It was removed about a year before the tunnel fire that shut the railroad down. It took about a year and a half to reopen the tunnel. The lumber mills all went to trucking and carload traffic never returned to to the volumes before the tunnel fire and shutdown.