Re: IJ Article on "Major Gaps" in SMART Service
Author: Craig Tambo
Date: 05-19-2017 - 16:35
Cprr Wrote:
-------------------------------------------------------
> What was the SP schedule like back in the day? The
> problem is dispatchers who have no clue how to run
> a single line railroad.
The NWP (albeit an SP subsidiary) operation back in the day was mostly double-track, and was run with timetable schedule authority, staffed interlocking towers, and a whole lot more employees. Added to the mix were through passenger trains and freights (including narrow-gauge at one time). But that was then ...