Sound Transit rail to SeaTac
Author: D
Date: 08-13-2008 - 17:22
I believe that the Beacon Hill station is not complete, ready for service. One tunnel track was evidently complete enough to allow pulling a car thru. The East portal is not complete.
The station East of Pacific Highway South appears from a distance to be complete.
The station at SeaTac is under construction.
The trackway between these two stations isn't, yet.
Passenger transportation between the SeaTac station and the terminal - ?????????????????
==================================================================================================
Completion of the trackway along MLK allows ST to test the cars and the trackway, and training the operators, the supervisors, and the maintainers.
==============================================================================================