Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link
Author: Nussel Snouts
Date: 05-12-2018 - 12:40

It would have been helpful if we had been informed what grade of rail was used and what was intended to be used. Since this is as stated, not a safety issue but a wear issue, we would be able to discover what is the difference in performance. Perhaps the existing rails should be used to avoid the delay and waste, then prorate them now for expected life shortfall. Twenty years ago or less, the spec rail might not have existed. The latest premium rails were introduced in 2015. The rails that were used were most likely quite standard in the industry.
Having a friend in the construction business I get to hear stories all the time concerning government projects being designed way over sensible specs and using the same specs for temporary projects. Engineers make bad but well intentioned decisions too. A city wanted to greatly increase the amount of fly ash used in concrete for environmental reasons, right during a fly ash shortage. My friend had to attend a meeting with the engineers to dissuade them from their plan, stating other problems that would result from the idea. He can go into great detail about early concrete tie problems and the fines assessed against Lone Star, resulting from a process issue, not an evil scheme.



Subject Written By Date/Time (PST)
  Tutor Perini installs 3.2 miles of substandard rails in SF job ... Graham Buxton 05-11-2018 - 21:11
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... Carol L Voss 05-11-2018 - 22:47
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... synonymouse 05-11-2018 - 22:51
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... Commenter 05-12-2018 - 00:37
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... Bill Hough 05-12-2018 - 10:15
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link Graham Buxton 05-12-2018 - 05:06
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link Anthony G. 05-12-2018 - 07:08
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link BOB2 05-12-2018 - 07:37
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link George Andrews 05-12-2018 - 08:40
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link david vartanoff 05-12-2018 - 09:39
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link SP5103 05-12-2018 - 10:51
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link Nussel Snouts 05-12-2018 - 12:40
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job >> clickable link BOB2 05-12-2018 - 15:01
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... Ed Workman 05-12-2018 - 17:02
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... HUTCH 7.62 05-12-2018 - 17:45
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... Commenter 05-12-2018 - 19:09
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... BOB2 05-12-2018 - 20:24
  Re: Tutor Perini installs 3.2 miles of substandard rails in SF job ... Carol L Voss 05-12-2018 - 20:36


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********   **    **   *******   ********  ********  
 **     **  ***   **  **     **  **        **     ** 
 **     **  ****  **         **  **        **     ** 
 **     **  ** ** **   *******   ******    ********  
 **     **  **  ****         **  **        **        
 **     **  **   ***  **     **  **        **        
 ********   **    **   *******   **        **        
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com