Welf termination holes and steel fabrication flaws faulted for Tranbay Terminal cracks
Author: synonymouse
Date: 12-14-2018 - 09:59

[www.mercurynews.com]

The tentative repair "plan will include bolting steel plates onto both sides of the girder to reinforce it."

Still there remains the question of inherent building design problems:

"But, Dhalwala said it’s important to consider the potential for fractures in the design itself. The building code doesn’t mandate a complete fracture analyses, though it does address some conditions as part of the design specifications. For large buildings, especially ones in earthquake-prone zones, fracture analysis is even more important, he said."



Subject Written By Date/Time (PST)
  Welf termination holes and steel fabrication flaws faulted for Tranbay Terminal cracks synonymouse 12-14-2018 - 09:59
  Re: Welf termination holes and steel fabrication flaws faulted for Tranbay Terminal cracks synonymouse 12-14-2018 - 10:00


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **   *******   **      **  ********   ********  
 **     **  **     **  **  **  **  **     **  **     ** 
 **     **         **  **  **  **  **     **  **     ** 
 **     **   *******   **  **  **  ********   ********  
  **   **          **  **  **  **  **     **  **        
   ** **    **     **  **  **  **  **     **  **        
    ***      *******    ***  ***   ********   **        
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com