PCC (WSDOT) line shut down
Author: Throttle Hogg
Date: 03-14-2019 - 13:14

The WSDOT rail line extending east from Hooper, WA to Colfax and Thornton has been shut down
since Jan 23 due to erosion along the tracks near Pampa (west of LaCrosse). After a WSDOT study and bidding process, Shamrock Construction was selected as the low bidder to backfill and riprap the location along Willow Creek. WSDOT hopes to have the line back in operation by April 15 when the new 110 car loader belonging to Northwest Grain Growers comes on line at Endicott.



Subject Written By Date/Time (PST)
  PCC (WSDOT) line shut down Throttle Hogg 03-14-2019 - 13:14
  Re: PCC (WSDOT) line shut down Ross Hall 03-14-2019 - 18:30


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
       **   ******   **     **  **     **  **    ** 
       **  **    **   **   **   **     **   **  **  
       **  **          ** **    **     **    ****   
       **  **           ***     *********     **    
 **    **  **          ** **    **     **     **    
 **    **  **    **   **   **   **     **     **    
  ******    ******   **     **  **     **     **    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com