Re: San Diego Trolley car at So. Cal RR Museum (ex-OERM)
Author: Pred F. Terris
Date: 04-02-2019 - 15:19
Has Metrolink given the green light to OERM to reconnect? Will RCTC pay the installation costs?
Will OERM's CTC Tie into Metrolink's?
NEVER Wrote:
-------------------------------------------------------
> The long-stalled depot project is still stalled.
> The new switch is sitting on a flat in the patch
> lot. We have everything ready to go. Joint powers
> blues.
>
> More important is having enough ops crew to run
> events these days.
>
> Put that in your kraut car and smoke it.