Re: $MART to Windsor
Author: Muff
Date: 11-18-2019 - 09:58
And these cost factors weren't known a year ago?
P.S. The base may be $55 MM rather than $50MM
in which case it's a smaller cost increase.
But Farhad is notorious. Just look at how much the
Grant Ave. station cost vs. its original estimate.
And what about the entire system.
The point: this agency has consistently misled the public
regarding how much the infrastructure costs. And that
continues to this day.