Re: BNSF breaks ground on second Sandpoint bridge
Author: Fred Flintstone
Date: 03-07-2020 - 13:52

I didn't catch it in the link. I was always told by BNSF people that the new bridge would be built and then the old bridge would either be rebuilt or replaced so it would be quite a while before it is actually a double track railroad. Is this still the case?? Has there been any
progress on double tracking the Spokane River bridge near Irvin?



Subject Written By Date/Time (PST)
  BNSF breaks ground on second Sandpoint bridge Pdxrailtransit 03-07-2020 - 08:45
  Re: BNSF breaks ground on second Sandpoint bridge Chester 03-07-2020 - 13:46
  Re: BNSF breaks ground on second Sandpoint bridge Fred Flintstone 03-07-2020 - 13:52
  Re: BNSF breaks ground on second Sandpoint bridge Dilbert 03-07-2020 - 21:25
  Re: BNSF breaks ground on second Sandpoint bridge Bruce Kelly 03-08-2020 - 07:45


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  ********   ******   ********  **    ** 
  **   **   **        **    **  **    **  ***   ** 
   ** **    **        **            **    ****  ** 
    ***     ******    **           **     ** ** ** 
   ** **    **        **          **      **  **** 
  **   **   **        **    **    **      **   *** 
 **     **  ********   ******     **      **    ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com