Re: BNSF breaks ground on second Sandpoint bridge
Author: Dilbert
Date: 03-07-2020 - 21:25

As far as the Spokane River bridge is concerned. Surveying of the site and some core sampling
of ground has been done. Legal notice in local paper indicated enviromental studies taking place. BNSF has been doing fiber optic cabling in the area for signals (so ATCS may go dark soon.)



Subject Written By Date/Time (PST)
  BNSF breaks ground on second Sandpoint bridge Pdxrailtransit 03-07-2020 - 08:45
  Re: BNSF breaks ground on second Sandpoint bridge Chester 03-07-2020 - 13:46
  Re: BNSF breaks ground on second Sandpoint bridge Fred Flintstone 03-07-2020 - 13:52
  Re: BNSF breaks ground on second Sandpoint bridge Dilbert 03-07-2020 - 21:25
  Re: BNSF breaks ground on second Sandpoint bridge Bruce Kelly 03-08-2020 - 07:45


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **    **  ********  ********  **         ********  
 **   **   **        **        **    **   **     ** 
 **  **    **        **        **    **   **     ** 
 *****     ******    ******    **    **   ********  
 **  **    **        **        *********  **        
 **   **   **        **              **   **        
 **    **  ********  ********        **   **        
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com