Re: Alameda Belt Line: Info. on Interchange with SP and ATSF
Author: TMer
Date: 12-12-2020 - 12:45
Thanks a lot OPRRMS. One followup. Was all the trackage on the island, outside of the NAS, considered ABL? Like the team track that was right there next to the lift bridge ABL? Thinking the 60's here, rather than later periods like 90's or 00's.