Re: Emeryville bike/ped overpass
Author: WebDigger
Date: 12-31-2020 - 09:46
"
The main span consists of an S-curved single span across the railroad tracks, about 230 feet long, supported at its ends by concrete bents. It is supported by a single straight bowstring truss/arch that extends diagonally across the deck; the top chord/arch rib is a pair of steel tubes, the bottom chord/tension tie is within the deck framing, and the cable diagonals/suspenders support the deck edges. A concrete slab traveled way, with fencing and lighting, is carried by the steel deck framing."
-- [