CAHSR - ruling grade?
Author: Emp. Nero
Date: 08-11-2021 - 22:06

The CAHSR posted a vid showing construction progress.

[www.youtube.com]

The Hanford Viaduct is a huge sucker (6000 ft long).

Question: What is the ruling grade (%) of the line? The elevated sections require ramps that I assume are gently sloping.

"The Authority currently has 119 miles under construction in the Central Valley within three construction packages. Design-builder contractors Tutor-Perini/Zachry/Parsons, Dragados-Flatiron/Joint Venture, and California Rail Builders together have 35 active construction sites with an average of 1,100 workers dispatched each day."



Subject Written By Date/Time (PST)
  CAHSR - ruling grade? Emp. Nero 08-11-2021 - 22:06
  Re: CAHSR - ruling grade? Emp. Nero 08-11-2021 - 22:14
  Re: CAHSR - ruling grade? Ernest H. Robl 08-12-2021 - 10:22
  Re: CAHSR - ruling grade? FUD 08-13-2021 - 06:23
  Failing grade Narrator 08-13-2021 - 10:46
  Re: CAHSR - ruling grade? Clem 08-13-2021 - 22:53
  Re: CAHSR - ruling grade? LES 08-14-2021 - 04:34


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **    **  **    **  **     **  ******** 
 ***   ***   **  **   ***   **  **     **     **    
 **** ****    ****    ****  **  **     **     **    
 ** *** **     **     ** ** **  *********     **    
 **     **     **     **  ****  **     **     **    
 **     **     **     **   ***  **     **     **    
 **     **     **     **    **  **     **     **    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com