Re: They still need a siding between Seacliff and South Switch Santa Barbara
Author: BOB2
Date: 11-16-2022 - 10:50

T Wrote:
-------------------------------------------------------
> .

The Ortega siding reconstruction/extension project is on the LOSSAN improvements list with a full two mile CTC siding. I cannot find anything recent on the current status of this project.



Subject Written By Date/Time (PST)
  Leesdale Siding/DT extension engineering contracts up for bid. BOB2 11-15-2022 - 21:53
  They still need a siding between Seacliff and South Switch Santa Barbara T 11-16-2022 - 04:50
  Re: They still need a siding between Seacliff and South Switch Santa Barbara BOB2 11-16-2022 - 10:50
  Re: They still need a siding between Seacliff and South Switch Santa Barbara Endangered Everything 11-16-2022 - 11:04
  Re: They still need a siding between Seacliff and South Switch Santa Barbara George Andrews 11-16-2022 - 20:08


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **     **  ********   ********  ******** 
 **     **  **     **  **     **     **        **    
 **     **  **     **  **     **     **        **    
 **     **  *********  **     **     **        **    
 **     **  **     **  **     **     **        **    
 **     **  **     **  **     **     **        **    
  *******   **     **  ********      **        **    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com