to the Old Pole Burner
Author: The Montezuma Yardmaster
Date: 12-17-2009 - 17:11
1. Is the new, mandated positive train control system a g.p.s.-based system using satellites?
2. Is such a system fail-safe?
3. On a double-or-more-track railroad, can the system determine with certainty which track he train in on?
I would like you to explain why the new p.t.c. is not adding any safety to operations.