NAPA flood control project
[
www.napavalleyregister.com]
[
www.napafloodcontrol.com]
Project Overview
Project Title: Napa Railroad Relocation Project
Client: US Army Corps of Engineers, Sacramento District
Contract Type: Negotiated Firm Fixed Price
Amount: $64,965,826, ($53,383,925 of this total is Recovery Act Stimulus funding)
Project Summary:
Relocate existing railway facilities including the removal of one railway bridge, removal of two building structures, and miscellaneous facility demolition
Construction of two new railway bridges, one over the Napa River, and the second over the planned Oxbow bypass
Raising three street railroad grade crossings at First and Third Streets and North Soscol Avenue
Raising 3300 linear feet of railroad track 2-5 feet in elevation
Reconstruction of streets and sidewalks including construction of retaining walls, stairs and ramps
Reconstruction of private driveways and sidewalks; relocation of underground utilities including domestic water, sewer, storm drain and electric; construction of new storm drain facilities and street lighting
Estimated Completion Date: January 2012