Author: BOB2
Date: 09-14-2011 - 23:47

Hasn't part of second main track installation been done between Industry and the east end of Basset?

It's technically not DT though.....

The San Gabriel trench has started construction, and several other grade sep projects in the San Gabriel Valley are also tied into the work being done prior to eventual completion of the second main track on the Alhambra "side".



Subject Written By Date/Time (PST)
  Double Tracking The Alhambra Sub Jim Speaker 09-14-2011 - 19:09
  Re: Double Tracking The Alhambra Sub Tree climber 09-14-2011 - 20:07
  Re: Double Tracking The Alhambra Sub Jim Speaker 09-14-2011 - 20:25
  Re: Double Tracking The Alhambra Sub Mr. Guy 09-14-2011 - 20:41
  Re: }Second Main" Track On The Alhambra Sub BOB2 09-14-2011 - 23:47
  Re: }Second Main" Track On The Alhambra Sub Conductor Jake 09-15-2011 - 10:51
  Re: }Second Main" Track On The Alhambra Sub BOB2 09-15-2011 - 12:51
  Re: }Second Main" Track On The Alhambra Sub Divey 09-15-2011 - 15:23


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
  ******    **    **  **    **        **  **     ** 
 **    **   **   **   **   **         **  **     ** 
 **         **  **    **  **          **  **     ** 
 **   ****  *****     *****           **  **     ** 
 **    **   **  **    **  **    **    **   **   **  
 **    **   **   **   **   **   **    **    ** **   
  ******    **    **  **    **   ******      ***    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com