@ Dave
Author: Howard
Date: 05-01-2012 - 13:06
dave buccolo Wrote:
-------------------------------------------------------
> WOW a torch cut rail, and while this is ok per FRA
> regualtions in Class 1 and 2 track not a good
> practice, also not sure how they get away with the
> mud fouling the ballast in the tunnel even on
> class 1 track and they do need some drainage.
All the rail in the tunnel was replaced. It was necessary to cut this section to remove it.
In addition, part of the tunnel work is reestablishing proper drainage. A benefit of all the mud is the ties are in perfect shape with no rot.