Re: FEMA 1998 report on the NCRA
Author: permanent fix
Date: 10-23-2007 - 23:21

If you read the Shannon and Wilson report you will find it has no real engineering calculations done. Most of the information was gathered by visual inspection, sometimes from a long distances. It was a very "shoot from the hip" report. Anywhere where repairs have actually been made have been 2 to 5 times more in cost than estimated in that report. And those were the easy parts.



Subject Written By Date/Time (PST)
  FEMA 1998 report on the NCRA Bit 10-23-2007 - 12:12
  Re: FEMA 1998 report on the NCRA Been There Done That 10-23-2007 - 15:52
  Re: FEMA 1998 report on the NCRA permanent fix 10-23-2007 - 17:17
  Re: FEMA 1998 report on the NCRA Bit 10-23-2007 - 20:17
  Re: FEMA 1998 report on the NCRA lawrence labranche 10-23-2007 - 22:07
  Re: FEMA 1998 report on the NCRA Bit 10-23-2007 - 22:34
  Re: FEMA 1998 report on the NCRA permanent fix 10-23-2007 - 23:21
  Re: FEMA 1998 report on the NCRA Bit 10-23-2007 - 23:43
  Re: FEMA 1998 report on the NCRA Been There Done That 10-24-2007 - 04:59
  Re: FEMA 1998 report on the NCRA The Panel of Experts 10-24-2007 - 13:24
  Re: FEMA 1998 report on the NCRA Been There Done That 10-30-2007 - 20:14


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **        **     **  **    **  **    **  **        
 **        **     **  **   **   ***   **  **    **  
 **        **     **  **  **    ****  **  **    **  
 **        **     **  *****     ** ** **  **    **  
 **        **     **  **  **    **  ****  ********* 
 **        **     **  **   **   **   ***        **  
 ********   *******   **    **  **    **        **  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com