Re: Any railroad related ballot measures on the ballot this election day???
Author: Dmac844
Date: 11-08-2007 - 15:10
I believe the Yardmaster is correct, the Beacon Hill tunnel will be the very last part of the line completed. Most of the line south of that point is looking close to completion, drive along I-5 south around Tukwila in the last couple of weeks and you can watch catenary being strung.
I believe that the section from the Pacific Hwy/SR-516 interchange into the airport proper will actually open a year or two later. Does anyone know if that is correct?