Grade Seperation Alhambra Sub Bassett-New Siding
Author: SGV
Date: 01-15-2007 - 12:54

For the past couple of months I have seen the power company raise power lines between the east end Bassett and the west end New Siding
ROW has been cleared, codeline poles are being removed, new control boxes and signals installed or moved, and buildings have been torn down.
There is a sign at Sunset Ave and Temple stating a grade separation project for the Alameda East Corridor project and it is showing the railroad elevated
(just like Hacienda Ave, between New Siding and the Twenty Seven X-over )
So the Alhambra Sub will be "raised" to go over California, Sunset, Orange and Puente. Don’t know if Vineland is included
There are 2 major spurs (Lumber and Tropicana) that see action almost everyday,
Have to watch how those are factored in.



Subject Written By Date/Time (PST)
  Grade Seperation Alhambra Sub Bassett-New Siding SGV 01-15-2007 - 12:54
  Re: Grade Seperation Alhambra Sub Bassett-New Siding JST3751 01-18-2007 - 23:20
  Re: Grade Seperation Alhambra Sub Bassett-New Siding SGV 01-19-2007 - 13:20


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **    **   ******   ********   ******    **      ** 
 ***   **  **    **     **     **    **   **  **  ** 
 ****  **  **           **     **         **  **  ** 
 ** ** **  **           **     **   ****  **  **  ** 
 **  ****  **           **     **    **   **  **  ** 
 **   ***  **    **     **     **    **   **  **  ** 
 **    **   ******      **      ******     ***  ***  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com