Re: End of the Columbia Draw Operator?
Author: theconductor
Date: 04-20-2015 - 18:23

I believe that the switches have been controlled by Ft Worth for years. As far as I know, the bridge operator is only responsible for lifting and lowering the bridge.

Corrections welcome.



Subject Written By Date/Time (PST)
  End of the Columbia Draw Operator? pdxrailtransit 04-20-2015 - 13:55
  Re: End of the Columbia Draw Operator? theconductor 04-20-2015 - 18:23
  Re: Widespread Tampering Shuts Down BNSF Tracks T.J. 04-21-2015 - 09:50
  Re: Widespread Tampering Shuts Down BNSF Tracks Pdxrailtransit 04-21-2015 - 11:13


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
       **  **     **   ******    **     **  **       
       **  ***   ***  **    **    **   **   **       
       **  **** ****  **           ** **    **       
       **  ** *** **  **   ****     ***     **       
 **    **  **     **  **    **     ** **    **       
 **    **  **     **  **    **    **   **   **       
  ******   **     **   ******    **     **  ******** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com