Nisqually Prairie Line work ramping up
Author: GN Goat
Date: 12-20-2015 - 04:26

Lots more activity on the Nisqually Prairie Line between Bridgeport Way and Dupont, WA along I-5.

More big rolls of cable (different colors). Some work with cables being done along old Pacific Hwy/Mounts Rd area and also at the N P L bridge over I-5.

More backhoes, and other equipment along the right-of-way. Saw couple trucks with "Northwest Line Builders" on them. Tried a search but didn't have much luck.

Welded rail is along side the line from DuPont up to Gravelly Lake Dr.

And there is a large amount of concrete ties stacked in a new storage area long the track.

Sorry no pics, not much light at 4 PM when I drive by and can't get off I-5 since I'm on the clock.

I did see a red metal flag sign just South of Bridgeport Way on the right of way, along with a derailer in place.

Nice to work ramping up!



Subject Written By Date/Time (PST)
  Nisqually Prairie Line work ramping up GN Goat 12-20-2015 - 04:26


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********   ********   **     **   *******   **    ** 
 **     **  **     **  **     **  **     **  ***   ** 
 **     **  **     **  **     **         **  ****  ** 
 ********   **     **  **     **   *******   ** ** ** 
 **     **  **     **   **   **          **  **  **** 
 **     **  **     **    ** **    **     **  **   *** 
 ********   ********      ***      *******   **    ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com