Track problem MP 7.06 Gilman St, Berkeley,CA
Author: Cal-P
Date: 02-07-2016 - 21:12

The concrete road crossing panels take a beating. And in this case the angle iron frame weld failed. Causing the mangled iron to lay over on to the #1 rail. Police presence w/flares and UP track inspector.
. Looks like MOW will need to appear tonight. Trains being walked across on the passable 2 track. Cal-P



Subject Written By Date/Time (PST)
  Track problem MP 7.06 Gilman St, Berkeley,CA Cal-P 02-07-2016 - 21:12


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **    **  **    **  **     **  ******** 
 **     **   **  **   ***   **  **     **     **    
 **     **    ****    ****  **  **     **     **    
 **     **     **     ** ** **  **     **     **    
 **     **     **     **  ****  **     **     **    
 **     **     **     **   ***  **     **     **    
  *******      **     **    **   *******      **    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com