Re: Perris switch
Author: interesting?
Date: 03-16-2024 - 16:19
According to Google, the switch on Metrolink's track is installed. What's not installed is the museum's track to connect with it.
Does the museum still intend to extend its track all the way into the Perris Metrolink station, where there's a cutout in the platform for a stub track long enough for a couple of PE cars? Looking at the satellite view, the necessary grade crossings appear to be built. If so, and if the switch for Metrolink is indeed present, is the "new" switch to complete a crossover to that parallel track?