Re: MRL / Mullan
Author: Kyle
Date: 07-26-2009 - 06:30

Very cool old piece of railroading. Cave in was part of a planned remodel project that became a little accelerated last week. MRL hopes to open mid week. Trains are parked but many were returned to BNSF including a KC/Pacso with a pair of boeing fuselages. Reroutes included Laurel Sub to Great Falls, BNSF Copper City Sub to UP @ Silver Bow, Laurel to Cheyenne and Glendive to Snowden.
It's been a tough year as we've watch all of the major lumber customers shut down due to the economy. The MRLs daily mainline freights (ML/LM) are no longer daily and the Polson job as needed.



Subject Written By Date/Time (PST)
  Slide blocks Mullan Pass tunnel [link] OPRRMS 07-25-2009 - 18:36
  Re: Slide blocks Mullan Pass tunnel [link] Dave Smith 07-25-2009 - 20:25
  MRL / Mullan d 07-25-2009 - 23:50
  Re: MRL / Mullan Kyle 07-26-2009 - 06:30


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
  *******   **     **  **     **  **     **  **     ** 
 **     **  ***   ***  **     **  **     **  **     ** 
 **     **  **** ****  **     **  **     **  **     ** 
  ********  ** *** **  **     **  **     **  **     ** 
        **  **     **   **   **   **     **  **     ** 
 **     **  **     **    ** **    **     **  **     ** 
  *******   **     **     ***      *******    *******  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com