NWP Repair Progress
Author: Mike Pechner
Date: 03-22-2007 - 18:52

I was up in Marin County today and saw that repair crews have removed the temporary berm just south of the Novato Creek Trestle and have repaired the washout at that location. Additionally, the nearly sixth years of growth along this stretch of ROW down to the Igancio Wye has been removed. There a still a number of minor washouts west of Schellville that need to be repaired, however, the tracks are open for Hi-rail and other track repair equipment from Reclaimation to the Haystack Bridge in Petaluma. The line is open from downtown Petaluma to M.P. 90 in the Russian River Canyon.
There are two major washouts between Pieta and Hopland. The line is open from there to the 155 foot washout at McGee Curve at the Base of Ridge Hill.



Subject Written By Date/Time (PST)
  NWP Repair Progress Mike Pechner 03-22-2007 - 18:52
  Re: NWP Repair Progress Bob L 03-23-2007 - 07:50
  Re: NWP Repair Progress Christian J. Goepel 03-23-2007 - 14:17
  Re: NWP Repair Progress Alf Doten 03-28-2007 - 18:54


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********   ********   *******         **  ********  
 **     **  **        **     **        **  **     ** 
 **     **  **        **               **  **     ** 
 ********   ******    ********         **  ********  
 **         **        **     **  **    **  **        
 **         **        **     **  **    **  **        
 **         **         *******    ******   **        
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com