Copper Basin Railway at Tunnel 2
Author: Ben Kletzer
Date: 08-11-2010 - 19:55

The first inbound loaded ore train, symbol OT-1, passes through Tunnel #2 on the way to Hayden, AZ. Hayden is the location of the ASARCO smelter, where the copper ore contained in this train is unloaded. Train OT-1 runs almost 24/7 bringing copper ore from the open pit mine at Ray, AZ to the Hayden Smelter.
This photo was taken on Drew Jacksich's and my trip to Arizona to shoot the Copper Basin and Apache Railways

Link: [www.railpictures.net]



Subject Written By Date/Time (PST)
  Copper Basin Railway at Tunnel 2 Ben Kletzer 08-11-2010 - 19:55
  Re: Copper Basin Railway at Tunnel 2 Tom Moungovan 08-12-2010 - 06:50
  Re: Copper Basin Railway at Tunnel 2 Tabasco 08-12-2010 - 13:22
  Re: Copper Basin Railway at Tunnel 2 Sam Reeves 08-12-2010 - 18:51
  Re: Copper Basin Railway at Tunnel 2 Ben Kletzer 08-13-2010 - 12:36
  Re: Copper Basin Railway at Tunnel 2 Margaret (SP fan) 08-18-2010 - 13:17


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **    **  **        ********   **    ** 
 ***   ***  ***   **  **        **     **  **   **  
 **** ****  ****  **  **        **     **  **  **   
 ** *** **  ** ** **  **        ********   *****    
 **     **  **  ****  **        **         **  **   
 **     **  **   ***  **        **         **   **  
 **     **  **    **  ********  **         **    ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com