BNSF Xmas schedule home
Author: Frevele
Date: 12-19-2011 - 15:24

Metrolink was on hand Sunday, awaiting final departure Duarte to immediately replace the bumper on the mainline at east bank of the San Gabriel River by MillerCoors Irwindale. All three local runs (yesterday was for Victorville-Barstow out of San Bernardino) were slated with All Volunteer crews. So ends 124 years of heavy rail west of mp119 (please paint Monrovia station before much longer) and goodbye beloved Santa Fe!

O-SBDTOP1-19 (business car trip 2011-35, 1656 miles)
depart San Bernardino (B-9/track 659) 21:00 PST Dec19
depart Needles 05:00 PST Dec20
depart Winslow 1300 MST Dec20
arrive Belen 17:45 MST Dec20; service train
depart Belen 18:45 MST Dec20
depart Clovis 00:45 CST Dec21
depart Amarillo 03:00 CST Dec21
Depart Wellington 09:00 CST Dec21
Arrive Topeka 13:00 CST Dec21

Consist won't necessarily include same pair of pumpkins that bracketed the trips:
BNSF 04 Missouri River
BNSF 10 Lake Superior
BNSF 41 Flathead River
BNSF 44 Powder River
BNSF 45 Colorado River
BNSF 02 Columbia River
BNSF 52 Glorieta Pass



Subject Written By Date/Time (PST)
  BNSF Xmas schedule home Frevele 12-19-2011 - 15:24
  Re: BNSF Xmas schedule home Rob C. Anton 12-19-2011 - 17:23


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  ********    ******   **     **  **    ** 
 ***   ***  **     **  **    **  ***   ***  **   **  
 **** ****  **     **  **        **** ****  **  **   
 ** *** **  ********   **        ** *** **  *****    
 **     **  **         **        **     **  **  **   
 **     **  **         **    **  **     **  **   **  
 **     **  **          ******   **     **  **    ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com