Metrolink Perris Valley Line
Author: Pdxrailtransit
Date: 02-24-2013 - 17:24

Assuming this ever comes to pass despite the organized resistance from UCR vicinity residents, I wonder how much of the Box Springs grade will be realigned. Isn't this about a 4% grade? If I remember correctly is was the steepest grade on the Santa Fe.



Subject Written By Date/Time (PST)
  Metrolink Perris Valley Line Pdxrailtransit 02-24-2013 - 17:24
  Re: Metrolink Perris Valley Line mook 02-24-2013 - 19:29
  Re: Metrolink Perris Valley Line George Andrews 02-24-2013 - 19:52
  Re: Metrolink Perris Valley Line Jim Speaker 02-24-2013 - 20:04
  Re: Metrolink Perris Valley Line Bruce Kelly 02-25-2013 - 19:52
  Re: Metrolink Perris Valley Line mvs 02-26-2013 - 09:55


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
  *******   **        **              **  ********  
 **     **  **        **              **  **     ** 
 **     **  **        **              **  **     ** 
  ********  **        **              **  ********  
        **  **        **        **    **  **     ** 
 **     **  **        **        **    **  **     ** 
  *******   ********  ********   ******   ********  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com