New signal bridges have popped up in several places on Donner as part of a larger signal upgrade on the line. UP sources have confirmed 2 MT between Switch 9 and Shed 10 is in the cards once more pressing projects are finished across the system. Installing appropriate signal hardware is not an indication of track construction starting in the near future. Just don't look for the #1 to return on the Norden to Shed 47 segment.