BART to Begin Testing Oakland Airport-BART Tramway Vehicles
Author: Walter Hazelwood
Date: 01-21-2014 - 20:47

There is a video link on the BART webpage.

The system is from the same Swiss company who rebuilt the Palm Springs Aerial Tramway in 2000.

So Oakland will have "cable cars" now.

FROM:
[www.bart.gov]

Test vehicles will soon be travelling on the Oakland Airport Connector (OAC) tracks above Hegenberger Road in Oakland as the project moves into one of the final phases before the anticipated opening for service this fall. The first of the new test vehicles was unveiled this morning at the OAC wheelhouse, the hub where 12-foot motorized wheels pull the cables that provide traction for the driverless vehicles.

“Passenger travel on the elevated guideway between Coliseum BART and the Oakland Airport Station is now less than a year away,” said BART Director Robert Raburn of Oakland. “I’m heartened that the Oakland Airport Connector will boost development in Oakland and the fact that the project has already put local people to work.”

The test vehicle unveiled today is the first of four that will travel along the 3.2 mile track, or guideway, between BART’s Oakland Airport/Coliseum Station and a new station next to the terminals at Oakland International Airport. The vehicles are being constructed in Oregon and shipped to the Bay Area for final assembly on site. All are expected to be in testing this spring.

Once OAC opens to the public, trains will complete the trip in just 8 minutes, 30 seconds. Total travel time, which includes walking from the BART Coliseum Station to the OAC platform and from OAC to the airport terminals, is expected to take 12 to 14 minutes.

The OAC will replace the current AirBART buses, which drive through nine intersections on local streets and take 20 to 25 minutes in ideal traffic conditions.

Fares for OAC have not yet been determined but are anticipated to be roughly equivalent to the $3.00 AirBART fare with the added advantage of allowing Clipper card holders to simply swipe their cards to pay.

The total cost of the project is $484 million and it is on time and on budget. The project’s local hiring program is exceeding its goals, with 934 of the 1,508 on site workers being local area residents, 271 of whom are from Oakland.

*END*



Subject Written By Date/Time (PST)
  BART to Begin Testing Oakland Airport-BART Tramway Vehicles Walter Hazelwood 01-21-2014 - 20:47
  Re: BART to Begin Testing Oakland Airport-BART Tramway Vehicles PVWB 01-21-2014 - 21:55
  Re: BART to Begin Testing Oakland Airport-BART Tramway Vehicles synonymouse 01-22-2014 - 11:07
  Re: BART to Begin Testing Oakland Airport-BART Tramway Vehicles Walter Hazelwood 01-22-2014 - 14:02
  Re: BART to Begin Testing Oakland Airport-BART Tramway Vehicles Espee99 01-22-2014 - 18:11


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
       **  ********  ********  **    **  **     ** 
       **     **     **        **   **   **     ** 
       **     **     **        **  **    **     ** 
       **     **     ******    *****     ********* 
 **    **     **     **        **  **    **     ** 
 **    **     **     **        **   **   **     ** 
  ******      **     ********  **    **  **     ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com