Transportation Planner Wrote:
-------------------------------------------------------
> It was a Caltrans Sustainable Transportation
> Planning Grant:
>
> [
www.dot.ca.gov]
> award.pdf
>
> Unfortunately going with this boondoggle meant
> that several other deserving planning studies got
> passed over, including an optimization study for
> the San Joaquins and a LOSSAN study:
>
> [
www.dot.ca.gov]
> nonaward.pdf
Well, now there you go....."Upstate Rail Connect" Wouldn't it be more sustainable to permanently fix an existing rail corridor with minimal grades and existing infrastructure using proper and appropriate engineering rather than go for a moon shot?
ARD