Re: DUMBARTON BRIDGE AGAIN
Author: Azebra
Date: 08-19-2017 - 11:25
At the time Samtrans bought it, I was still doing some projects with them. The purpose of the purchase was to preserve the ROW and bridge for basically undefined future use, so that the SP wouldn't abandon it and let the property revert to landowners or become a trail.
The vague directional thought for its use was SP-Fremont area train(s), with cross platform transfers to BART. A much more remote possibility was that ACE could operate a train from the valley to SF, but I do not believe that ACE actually ever had input to that idea.