Re: Got any drone footage of Gatwick Airport?
Author: HUTCH 7.62
Date: 12-21-2018 - 09:30
Coastline Bill Wrote:
-------------------------------------------------------
> Why does the bridge need to be a swing? Is there
> any freight traffic on the water anymore?. If so,
> were to?
>
> How deep is this end of the Bay? Could a trench,
> then place a short pre made tunnel be done here?
Most of the bay is 1ft to 2 ft but the channel is very deep and the currents very stong as the tide comes and goes especially where the swing span is. In fact as the bridge was being built in 1910 construction crews had problems with newly set pilings washing away.
Current plans are to build a lift bridge to replace the swing span.