Re: Empire Builder Spokane to Seattle running late
Author: Bruce Kelly
Date: 12-31-2008 - 07:54

Two weeks ago, No.7 left Spokane with a bad horn on the lead unit. After stopping at Lyons to think it over, and realizing the second unit wasn't equipped with a radio good enough for lead status, they put the conductor in the second unit and had him blow the horn as the engineer called out the crossings. Kept them from having to stop and proceed at each crossing.



Subject Written By Date/Time (PST)
  Empire Builder Spokane to Seattle running late GN Goat 12-30-2008 - 16:52
  Re: Empire Builder Spokane to Seattle running late SDP45 12-30-2008 - 17:39
  Re: Empire Builder Spokane to Seattle running late DQ 12-30-2008 - 21:01
  Re: Empire Builder Spokane to Seattle running late Bruce Kelly 12-31-2008 - 07:54


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********  **     **  **     **        **   ******   
 **        **     **  ***   ***        **  **    **  
 **        **     **  **** ****        **  **        
 ******    **     **  ** *** **        **  **   **** 
 **         **   **   **     **  **    **  **    **  
 **          ** **    **     **  **    **  **    **  
 ********     ***     **     **   ******    ******   
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com