Re: Amtrak No6 7 & Reno Fun Train
Author: WAF
Date: 02-27-2011 - 12:49
Dr Zarkoff Wrote:
-------------------------------------------------------
> Let's see,,,, two to four sets of flangers (2
> locomotives each with control cables and 7 air
> hoses) and a like number of spreaders with
> locomotives. The last time I timed adding an
> engine to the front of Amtrak, at Dunsmuir, was 30
> minutes, and the roundhouse guys didn't waste any
> time. Hmmmmmm, so I guess you're right, only 20
> minutes to put the snow equipment together.
FYI, I checked with our resident expert on snow removal on Donner.
So please, post your snow removal resume for us to read