Re: Shutdown of ABS on the Pasadena Sub-Yep
Author: BOB2
Date: 06-01-2012 - 07:02

Construction crews are already at work at a few locations on the Gold Line extension between Arcadia and Glendora. The BNSF/Metrolink Pasadena Sub will continue to serve the brewery, but beyond that, to Arcadia and Monrovia, the line appears to be out of service. I would suspect that the ABS is probably not going to be maintained much longer beyond Pomona for this remaining limited freight service.

In about three years you will be able to ride the route of the Super Chief/El Cap every 6 minutes at rush hour on the fastest stretch of LRT in the nation from Citrus College to Pasadena and on to LAUPT. Which sure beats the hell out of the totally gridlocked 210......



Subject Written By Date/Time (PST)
  Shutdown of ABS on the Pasadena Sub Adam Twiss 05-31-2012 - 18:09
  Re: Shutdown of ABS on the Pasadena Sub-Yep BOB2 06-01-2012 - 07:02
  Re: Shutdown of ABS on the Pasadena Sub-Yep Adam Twiss 06-01-2012 - 17:15


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **    **  **     **  ********  **         ******** 
 ***   **  ***   ***  **        **    **   **       
 ****  **  **** ****  **        **    **   **       
 ** ** **  ** *** **  ******    **    **   ******   
 **  ****  **     **  **        *********  **       
 **   ***  **     **  **              **   **       
 **    **  **     **  ********        **   **       
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com