Bulk rail
Author: WAF
Date: 12-12-2013 - 14:18
You can load 3 airslides or gravity hoppers in 24 hours ( at least that was the way it was 15 years ago). They need a lot of cars because they are always loading off of manufacturing line, i.e. hot sugar. C&H has very small bin storage so some of those rail cars in the storage yard are loads cooling.