Re: LOSSAN Improvements
Author: Berg
Date: 11-12-2014 - 12:53
If you would look before you post you would see the guys down the page are already talking about cuttimg in some of the new track at CP Don. New crossovers at CP Don for future two track operation. New track goes north on southside, under the freeway. Where Agra siding was going north new track is being constructed on the north side northward to connect with the older DT near the truck stop/Border Patrol checkpoint.
I guess that Metrolink could reinstall old Poche siding along Hwy 1.