Re: Connection disconnected IIRC the drawings I recall showed the connection and the extension to opposite the depot.
curiv4xous... Wrote:
-------------------------------------------------------
> [
www.google.com]
> 45,3a,30y,359.95h,83.37t/data=!3m6!1e1!3m4!1sCLzuN
> _EGi98325Uc2BQI1Q!2e0!7i16384!8i8192
> May 2019 street view photo looking toward the
> Perris station. And looking the other way...
> [
www.google.com]
> 45,3a,75y,188.01h,88.76t/data=!3m6!1e1!3m4!1sCLzuN
> _EGi98325Uc2BQI1Q!2e0!7i16384!8i8192
>
> Has the track been completed since May? 4th and
> 7th St. crossings were built along with the
> Metrolink construction, but how about the work in
> between? Sounds from your post like it's done, but
> the street views posted just show the crossings.
>
The post was about crossing gates.
No new track has been added beyond the crossings (and I am not counting derailment patch iron at oil).
The red board (derail) is in the same place.
FIRES BURNING