Re: Connection disconnected IIRC the drawings I recall showed the connection and the extension to opposite the depot.
Hey Melvin!
Long time no see. What are you currently working on at Perris.
Rudy
Melvin Wrote:
-------------------------------------------------------
> curiv4xous... Wrote:
> --------------------------------------------------
> -----
> >
> [
www.google.com]
>
> >
> 45,3a,30y,359.95h,83.37t/data=!3m6!1e1!3m4!1sCLzuN
>
> > _EGi98325Uc2BQI1Q!2e0!7i16384!8i8192
> > May 2019 street view photo looking toward the
> > Perris station. And looking the other way...
> >
> [
www.google.com]
>
> >
> 45,3a,75y,188.01h,88.76t/data=!3m6!1e1!3m4!1sCLzuN
>
> > _EGi98325Uc2BQI1Q!2e0!7i16384!8i8192
> >
> > Has the track been completed since May? 4th and
> > 7th St. crossings were built along with the
> > Metrolink construction, but how about the work
> in
> > between? Sounds from your post like it's done,
> but
> > the street views posted just show the
> crossings.
> >
>
> The post was about crossing gates.
>
> No new track has been added beyond the crossings
> (and I am not counting derailment patch iron at
> oil).
>
> The red board (derail) is in the same place.
>
> FIRES BURNING
> [
trainweb.org]