> Espee made several improvements to speed up train traffic. First, they installed a longer turnout in both Shed 10 and Switch 9. Secondly, they made several realignments. Their is a transition from the #2 track bridge to the #1 track. The track swings back to the #2 track for tunnel #37. It uses the #2 track for tunnels #36 and #35. Just east of the new UP installed signal bridge at Yuba Pass, it transitions back to the #1 track all the way to Switch 9.

Track speed between Switch 9 and Shed 10 was not changed. The realignments had more to do with moving the operating track away from all the rock and snow falls on the north side of the ridge.



Subject Written By Date/Time (PST)
  Donner Track Realignment Eric Gonzales 12-21-2019 - 01:14
  Re: Donner Track Realignment Dick Dorn 12-21-2019 - 10:58
  Re: Donner Track Realignment Lucky Strike 12-21-2019 - 15:51
  Re: Donner Track Realignment Dr Zarkoff 12-22-2019 - 10:21
  Re: Donner Track Realignment Eric Gonzales 12-21-2019 - 16:53


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **   *******   ********  ********   ******** 
 ***   ***  **     **  **        **     **     **    
 **** ****  **         **        **     **     **    
 ** *** **  ********   ******    ********      **    
 **     **  **     **  **        **            **    
 **     **  **     **  **        **            **    
 **     **   *******   **        **            **    
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com