Re: Kennecott copper GP39-2 High Cabs
Author: Craig Tambo
Date: 01-11-2020 - 13:27

While working in the pit, the second crew member was probably riding the point a lot (assuming they operated that way). The point of the high cab was so the engineer could see over the tops of the ore cars. I don't think these units were meant for the line haul to the smelter--they had SD40-2s for that. At least one still operates with the high cab, on the Salt Lake Garfield & Western RR.



Subject Written By Date/Time (PST)
  Kennecott copper GP39-2 High Cabs Bingham 01-11-2020 - 11:14
  Re: Kennecott copper GP39-2 High Cabs Craig Tambo 01-11-2020 - 13:27
  Re: Kennecott copper GP39-2 High Cabs Pdxrailtransit 01-11-2020 - 15:20
  Re: Kennecott copper GP39-2 High Cabs BN Oly 01-11-2020 - 15:29
  Re: Kennecott copper GP39-2 High Cabs OPRRMS 01-11-2020 - 16:04
  Re: Kennecott copper GP39-2 High Cabs George Andrews 01-12-2020 - 19:19
  Re: Kennecott copper GP39-2 High Cabs OPRRMS 01-11-2020 - 15:43
  Re: Kennecott copper GP39-2 High Cabs Pdxrailtransit 01-11-2020 - 16:24
  Re: Kennecott copper GP39-2 High Cabs Steve 01-12-2020 - 05:26
  Re: Kennecott copper GP39-2 High Cabs Berg 01-12-2020 - 16:14
  Re: 844 is getting a new high cab Ed McMuffin 01-13-2020 - 19:03


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 ********  ********  **     **  **      **  **    ** 
    **        **     **     **  **  **  **  ***   ** 
    **        **     **     **  **  **  **  ****  ** 
    **        **     **     **  **  **  **  ** ** ** 
    **        **      **   **   **  **  **  **  **** 
    **        **       ** **    **  **  **  **   *** 
    **        **        ***      ***  ***   **    ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com