Re: BNSF breaks ground on second Sandpoint bridge
Author: Fred Flintstone
Date: 03-07-2020 - 13:52

I didn't catch it in the link. I was always told by BNSF people that the new bridge would be built and then the old bridge would either be rebuilt or replaced so it would be quite a while before it is actually a double track railroad. Is this still the case?? Has there been any
progress on double tracking the Spokane River bridge near Irvin?



Subject Written By Date/Time (PST)
  BNSF breaks ground on second Sandpoint bridge Pdxrailtransit 03-07-2020 - 08:45
  Re: BNSF breaks ground on second Sandpoint bridge Chester 03-07-2020 - 13:46
  Re: BNSF breaks ground on second Sandpoint bridge Fred Flintstone 03-07-2020 - 13:52
  Re: BNSF breaks ground on second Sandpoint bridge Dilbert 03-07-2020 - 21:25
  Re: BNSF breaks ground on second Sandpoint bridge Bruce Kelly 03-08-2020 - 07:45


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
 **     **  **    **  ********  ********        ** 
 ***   ***  ***   **     **     **    **        ** 
 **** ****  ****  **     **         **          ** 
 ** *** **  ** ** **     **        **           ** 
 **     **  **  ****     **       **      **    ** 
 **     **  **   ***     **       **      **    ** 
 **     **  **    **     **       **       ******  
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com