Re: Millersburg (OR) Intermodal?
Author: Railbaron
Date: 10-08-2022 - 03:33
From what I saw a few months ago work has simply stopped on that project; I really doubt UP is particularly interested.
The switch and signals have been installed at the south end out to the mainline. The tracks (3) at the ramp on the inside have been laid. The switch and signals to the siding at the north end have been installed. However, there is a gap of a couple hundred feet between the ramp tracks and the switch at the north end and there was no sign of any pending activity finishing the project.