Re: Bob2. Train to Chico? I assume you mean in the daytime?
Author: Joe Cullum
Date: 12-18-2023 - 12:35

Bob,

I thought the Chico extension was going to be a couple of San Joaquins (the ones that run from Stockton to Sacramento via Lodi.

Exeter Joe

BOB2 Wrote:
-------------------------------------------------------
> El Gringo Wrote:
> --------------------------------------------------
> -----
> > Bob2 does money just grow on trees or is this
> even
> > viable.
> >
> > Also, we do need a SP christmas story. Maybe
> > something with an SW1500 or SD9
>
> ACE's plans to run up the Valley to Chico by
> rebuilding part of the SN mainline are probably
> more likely to happen before you will get there on
> the UP... One or two extensions of the Capitols
> might be possible, but really would not be
> optimal, for the kind of all day "frequency" of
> services that would be needed to generate optimal
> ridership for that corridor.
>
> I'd prefer to tell stories about SD-7's...
>
> Christmas's at the Shops SP would cancel most jobs
> toward the end of my career, as no outbound trains
> were set, and just have one job with a pair of
> SW-1500's to reduce arriving trains. A slow day
> with good overtime...
>
> Best part of Christmas on the old SP for many
> years was taking the Christmas trees to 8th Street
> with an SW 1500 in the early evening down Alamdea
> Street, with all of the families with kinds buying
> wholesale trees...
>
> The best Christmas Eve party was my final
> Christmas on the SP, while running a switcher with
> my crew, fondly referred to as the redneck, the
> dago, and the yid, on the daylight "mill job" out
> of the Shops... We would work a LAHOT, or some
> other train in the morning, and then go over to
> switch the old mill around 11 am, stopping at
> Sam's stand (at the old BullRing/Links there on
> North Spring) for coffee usually. We would often
> take a cut of empty pigs over, or bring a cut of
> empty pigs back to the Shops, as the bullring was
> still used for pig storage then.
>
> On Christmas eve the SP Signal Maintainers shop
> had a big Christmas party at the Bullring/Links
> (located down where the Dash bus yard is under the
> Chinatown Gold Line Station on North
> Spring/Alamdea today)on the lead to the old mill.
> We switched the mill on Christmas eve, and gave
> all of the Signal maintainer's kids rides on the
> pair of SW 1500 engines, up and down the lead, and
> had great food brought in by all of the
> families...
>
> You can't do fun things like that on the RR
> anymore...
>
> Merry Christmas....



Subject Written By Date/Time (PST)
  Bob2. Train to Chico? El Gringo 12-18-2023 - 00:11
  Re: Bob2. Train to Chico? I assume you mean in the daytime? BOB2 12-18-2023 - 08:42
  Re: Bob2. Train to Chico? I assume you mean in the daytime? Joe Cullum 12-18-2023 - 12:35
  Commuter train to connect Chico to Sacramento in the works Commenter 12-18-2023 - 12:50
  Re: Bob2. Train to Chico? I assume you mean in the daytime? BOB2 12-18-2023 - 13:03
  Connection issues for Chico The Man 12-18-2023 - 14:04
  Re: Connection issues for Chico El gringo 12-19-2023 - 00:28


Go to: Message ListSearch
Subject: 
Your Name: 
Spam prevention:
Please, enter the code that you see below in the input field. This is for blocking bots that try to post this form automatically.
  ******   ********  ********  **        **    ** 
 **    **  **        **        **        **   **  
 **        **        **        **        **  **   
 **        ******    ******    **        *****    
 **        **        **        **        **  **   
 **    **  **        **        **        **   **  
  ******   ********  ********  ********  **    ** 
This message board is maintained by:Altamont Press
You can send us an email at altamontpress1@gmail.com